Limited Time! $10k in upgrades on your new Oly Home. Ends 30 November.Learn More
Modular Defence housing delivered to RAAF Base Scherger, Weipa
Home/Blog/Modular Defence housing delivered to RAAF Base Scherger, Weipa

Modular Defence housing delivered to RAAF Base Scherger, Weipa

Published on 2 Oct 2026 | By Oly Homes | 5 min read

Built on the Sunshine Coast. Delivered to Cape York.

Delivering permanent housing in remote Australia presents a very different set of challenges. Distance, climate, transport logistics, access to trades and weather can all add complexity to a conventional construction program.

At RAAF Base Scherger, near Weipa in Far North Queensland, Defence Housing Australia needed new homes designed not only for Defence members and their families, but for the realities of their remote location.

Oly Homes was engaged to deliver three new modular homes as part of the redevelopment of an existing residential site, with responsibilities extending across planning, design, construction, transport, installation and commissioning.

The result demonstrates how modular construction can support government and organisational housing projects where location and logistics are every bit as important as the buildings themselves.

Project snapshot

Client: Defence Housing Australia
Location: RAAF Base Scherger, near Weipa, Cape York Peninsula, Queensland
Project: Defence member and family housing
Homes: Three new modular homes
Scope: Demolition, design and construction, transport, installation, site works and commissioning
Distance travelled: Approximately 2,350 km
Transport: Nine semi-trailers over five days

Housing designed for Far North Queensland

These were not simply homes being built elsewhere and transported north. They needed to be designed around the conditions they would face once they arrived.

Working with Defence Housing Australia and Defence, the homes incorporated measures responding to the heat, humidity, heavy rainfall and potential flooding of Far North Queensland.

Design responses included raised building levels, measures to protect services from potential flooding, air-conditioning systems selected to assist with moisture management, durable non-timber decking and mould-resistant finishes.

DHA has also highlighted the importance of providing Defence members in remote locations with modern, climate-appropriate housing comparable with the quality of accommodation available in metropolitan locations. DHA

For remote housing projects, this is one of the significant advantages of modular construction. The building can be designed for its destination while much of the construction takes place in a controlled factory environment, before being transported and installed on site.

More than manufacturing the homes

Oly Homes’ role extended well beyond the factory build.

The project scope included demolition and site preparation, design and construction documentation, manufacture, transport and installation, together with associated site works, service coordination, commissioning and handover.

That end-to-end capability is particularly important on regional and remote projects, where coordinating multiple stages, contractors and locations can introduce additional risk and complexity.

Oly Homes applies the same integrated approach across Defence housing, council and government housing, workforce and staff accommodation, community housing, accessible housing and multi-residential projects.

[Explore Oly Homes’ community, government and commercial project capability]